The project involves constructing a new 200,000 sq. ft. building on a 759,400 sq. ft. site for 400-500 users. The client aims for a research center with R&D labs, production lines, cloud service centers, offices, warehouses, greenhouses, and loading docks. Green initiatives include a rooftop greenhouse, recycling space, water management systems, heat recuperating walls, and geothermal/solar energy. Systems for greywater/stormwater management and geothermal energy for greenhouses are included. The structure will use 75% recycled steel, with multi-level steel parking and roof membrane protection. Fire protection includes sprinklers and water systems, focusing on warehouse material density. The design scope covers all aspects up to the Permit Set.