Hypertec Headquarters

The project involves constructing a new 200,000 sq. ft. building on a 759,400 sq. ft. site for 400-500 users. The client aims for a research center with R&D labs, production lines, cloud service centers, offices, warehouses, greenhouses, and loading docks. Green initiatives include a rooftop greenhouse, recycling space, water management systems, heat recuperating walls, and geothermal/solar energy. Systems for greywater/stormwater management and geothermal energy for greenhouses are included. The structure will use 75% recycled steel, with multi-level steel parking and roof membrane protection. Fire protection includes sprinklers and water systems, focusing on warehouse material density. The design scope covers all aspects up to the Permit Set.

Siège social de Hypertec